Skip to content
Peculiar Materials

Insights › Rare-earth magnet supply chain atlas › Evolution Metals & Technologies Corp. (Pohang)

South Korea

Evolution Metals & Technologies Corp. (Pohang)

A South Korean producer of NdPr metal, NdPr alloy powder and sintered magnets at Pohang, listed on Nasdaq since January 2026 through a SPAC merger. Its annual report discloses 660 t/yr of magnet capacity; its press releases describe 1,000 t/yr today and more than 10,000 t/yr by the end of 2026. Its latest quarterly report records substantial doubt about its ability to continue as a going concern.

Points to check

Facts from the sources on this page that a reader should weigh before relying on the company's own figures.

At a glance

Founded
2007 — The operating history begins with a first magnet plant in South Korea in 2007. The listed parent was created on January 5, 2026, when Evolution Metals LLC combined with Welsbach Technology Metals Acquisition Corp., a blank check company that had listed in December 2021, and the combined company was renamed Evolution Metals & Technologies Corp. The four Korean operating companies — KMMI INC., KCM Industry Co., Ltd., NS World Co., Ltd. and Handa Lab Co., Ltd. — were acquired by Evolution Metals LLC before that closing.
Headquarters
Pohang, North Gyeongsang Province, South Korea. The listed parent is a Delaware corporation trading on Nasdaq as EMAT, Commission File No. 001-41183.
Ownership
Public, Nasdaq: EMAT. At the close of the business combination on January 5, 2026 the company had 593,349,852 shares outstanding, rising to 621,790,646 by June 30, 2026. The four Korean operating companies received approximately 0.52% of the shares issued at closing between them; the remainder went to Evolution Metals LLC's pre-existing holders. Financing since has been through convertible debentures with YA II PN, Ltd. under a facility of up to $100 million, converting at the lower of $12.09 or 95% of the lowest daily volume-weighted average price over the five preceding trading days, with a floor of $1.86.
Stage
Ramping. Selling magnets and alloy from Pohang since 2007-2008 on 660 t/yr of disclosed capacity, and partway through an announced expansion to more than 10,000 t/yr by the end of 2026. No tonnage produced has been disclosed, and the company reports substantial doubt about continuing as a going concern.
Listing
Nasdaq: EMAT
Revenue
$3.5 million
Reported, six months ended June 30, 2026.
Quarterly revenue was $1.9 million in the first quarter of 2026 and $1.6 million in the second. Company guidance, which is not revenue, is $5 million to $8 million for fiscal 2026 and $400 million to $460 million for fiscal 2027; the company states the 2027 range does not represent full utilization and it is not based on contracted volumes.
Source

Capacity

Each date below links to the document the figure came from. A capacity figure with no source is not on this page.

WhatFigureStatusAs of
First magnet plant, South Korea — company milestone list400 t/yr in a 1,266 square meter area, from 2007Operating2026-02-20
Second magnet plant, South Korea — company milestone list260 t/yr in a 1,397 square meter area, from 2024. With the 2007 plant this gives 660 t/yr of magnet capacity disclosed in the annual report.Operating2026-02-20
NdPr metal and NdPr alloy plant, South Korea — company milestone list. Alloy powder customers named for 2022 are Mate (Japan), Kolektor (Slovenia) and NS World (South Korea)NdPr metal 144 t/yr and NdPr alloy 216 t/yr in a 3,379 square meter area, from 2021Operating2026-02-20
Magnet production capacity as described in company press releases from August and September 2026approximately 1,000 t/yr, described as the base from which production scales to 10,000 t/yr. This figure does not appear in the annual report, which gives 660 t/yr. See the conflicts below.Announced2026-08-27
Sintered and bonded magnet capacity at Pohang, targetmore than 10,000 t/yr by the end of 2026. Equipment is under a binding order with ULVAC — 13 sintered magnet machines and 8 furnace equipment supply contracts — for delivery no later than November 30, 2026, shipped from Dalian, China. No power agreement, land acquisition or committed construction capital has been disclosed as executed.Announced2026-08-27
Rare earth magnet manufacturing capacity in the United States, target stated in the annual reportapproximately 55,000 t/yr within two years, alongside approximately 78,000 t/yr of battery-grade carbonates, sulfates and pCAM. No site, state, funding source or permit has been announced.Announced2026-02-20
NdPr metal feedstock supply from Senri Trading Co., Ltd. and SRE Vietnam, a subsidiary of Tokai Trading Co., Ltd. of Japanfirst shipment of 5 metric tons received July 22, 2026, described as the first stage of an agreement for deliveries to scale. Total contracted volume, term, price and binding status are not published, and the agreement has not been filed as an exhibit.Announced2026-07-22

Narrative

The company's filings and its announcements describe very different scales of business. The annual report filed February 20, 2026 gives magnet capacity of 660 t/yr across a 400 t/yr plant from 2007 and a 260 t/yr plant from 2024, plus an NdPr metal and alloy plant from 2021. Press releases from May to September 2026 describe approximately 1,000 t/yr and an expansion to more than 10,000 t/yr by the end of 2026, supported by a binding equipment order with ULVAC for delivery by November 30, 2026, a conditional grant of about $20.7 million from Pohang City and Gyeongbuk Province, and an agreement in principle with Korea Electric Power Corporation to raise site power from 130 MW to 750 MW. No filing reports a tonnage produced or shipped. Revenue was $3.5 million for the first half of 2026. The second-quarter report discloses cash of $5.3 million, a net working capital deficit of $78.8 million, $2.3 million of convertible notes in maturity default, and management's conclusion that substantial doubt about the company's ability to continue as a going concern has not been alleviated. The operating business is four Korean companies acquired by Evolution Metals LLC before its combination with Welsbach Technology Metals Acquisition Corp.; the magnet business is KMMI at Pohang.

Where public sources disagree

Latest reports

PeriodPublishedReport
Q2 2026 (quarter to 30 Jun 2026)2026-08-17Form 10-Q
FY 2025 (year to 31 Dec 2025)2026-02-20Form 10-K

Across these reports

Quarterly revenue fell from US$1.9M to US$1.6M across the first two quarters of 2026, cash was US$5.3M against a US$78.8M working capital deficit at June 30, and the share count rose by about 28 million. Stated magnet capacity rose from 660 t/yr in the annual report to about 1,000 t/yr in releases, with 10,000 t/yr targeted for end-2026 and no tonnage produced reported.

MeasureWhat the reports show
Revenue (quarterly, US$)US$1.9M (Q1 26) → US$1.6M (Q2 26); US$3.5M for H1 2026.
Cash and working capitalCash US$5.3M and a net working capital deficit of US$78.8M at 30 Jun 2026; US$2.3M of convertible notes in maturity default; going-concern doubt not alleviated.
Shares outstanding593,349,852 at the 5 Jan 2026 closing → 621,790,646 at 30 Jun 2026, with convertible debentures under a facility of up to US$100M.
Magnet capacity as stated660 t/yr in the annual report (Feb 2026) → about 1,000 t/yr in press releases (Aug-Sep 2026) → 10,000 t/yr targeted by end-2026; no tonnage produced or shipped in any filing.

Stated dates

TargetFirst statedNowStatus
Magnet capacity above 10,000 t/yr at Pohangend-2026 (release, 14 May 2026)end-2026 (release, 27 Aug 2026)not yet due
ULVAC sintering and furnace equipment deliveryby 30 Nov 2026 (release, 14 May 2026)by 30 Nov 2026not yet due
About 55,000 t/yr of US magnet capacityby 2028 (exhibit, 9 Jan 2026)within two years (10-K, 20 Feb 2026)not yet due

Figures are as the company reported them, linked to each report. This summarizes what changed between reports; it is not a view on the company or its shares.

Sources

  1. Annual report on Form 10-K, fiscal year 2025 — Evolution Metals & Technologies Corp., via SEC (2026-02-20)
  2. Quarterly report on Form 10-Q, period ended June 30, 2026 — Evolution Metals & Technologies Corp., via SEC (2026-08-17)
  3. Current report on Form 8-K, completion of business combination — Evolution Metals & Technologies Corp., via SEC (2026-01-09)
  4. 750 megawatt power infrastructure expansion announcement — Evolution Metals & Technologies Corp. (2026-08-27)
  5. Equipment purchase agreements with ULVAC — Evolution Metals & Technologies Corp. (2026-05-14)
  6. First NdPr metal shipment received — Evolution Metals & Technologies Corp., via SEC (2026-07-22)
  7. Vulcan Elements selects Benson, North Carolina for magnet facility — Vulcan Elements (2025-11-18)
  8. Vulcan Elements Benson site, 30 MW substation — The Center Square (2025-11)
  9. Evolution Metals projects $400 million to $460 million in 2027 revenue (carries Wall Street Wire's paid-promotion disclosure) — Wall Street Wire via News Direct (2026-09)
  10. Evolution Metals & Technologies consummates business combination — Evolution Metals & Technologies Corp. via GlobeNewswire (2026-01-05)

How this page is sourced

Everything here comes from public sources — company filings, annual reports, exchange announcements, government releases and trade press. Every figure is linked to the document it came from and carries the date that document was published, because a capacity number without a date is not a fact, it is a rumor with a decimal point.

What is deliberately absent: material nonpublic information. I have spent more than two decades in this industry and a good deal of what I know about these companies I learned under NDA. Those obligations do not expire and they do not bend for a website. Nothing I have been told in confidence appears here in any form, and nothing on this page — or missing from it — should be read as a signal about what I know privately. I hold NDAs absolutely. It is the reason clients tell me things.

Judgment is the other thing left out on purpose. This page reports what has been published and who published it. Whether a target is credible, whether a ramp will hold, whether a capacity figure survives contact with the plant behind it — that is the work I do for clients, and it does not belong in a free reference page.

Where public sources disagree, I say so rather than picking a winner. Where a figure has not been published, the field says so rather than carrying an estimate. An empty field is information too.

Public filings tell you what a company has said. Whether it holds up is a different question, and the one I get hired to answer.

Get in touch